Coordination Between Civil Works And Pallet Parking Equipment
Car Size
• Max Length (mm): 5300
• Max Width (mm): 2050
• Height (mm): 1550
• Max Weight (kg): 2350
Lifting Speed: 0-60m/min
Speed of Vehicle Storage Mechanism: 0-30m/min
Control Method: Button/IC Card
The profitable implementation of pallet-type planar parking projects hinges on a degree of interdisciplinary coordination that a long way exceeds common development standards. The indispensable interface between civil works and the subsequent set up of specialised mechanical tools represents one of the most complicated and high-stakes components of the complete undertaking. Historically, misalignment between these two wonderful disciplines-where the static basis meets the dynamic automation system-is a major supply of pricey delays, overall performance deficiencies, and contractual disputes, making proactive integration a cornerstone of undertaking management.
The basis of this coordination lies in the civil works' potential to meet surprisingly stringent dimensional and structural specifications. This is now not only about setting up a strong ground and walls; it needs particular adherence to engineered necessities for flooring flatness (often unique with rigorous F-number tolerances), the precise positioning and plumbness of elevator shafts and switch zones, and proven load-bearing capacities that account for each static useless hundreds and dynamic operational forces. Achieving this requires no longer simply professional building however additionally early and non-stop communication. Detailed gear interface drawings and specs have to be built-in into the civil diagram files from the outset, making sure that embedded anchor bolts, structural reinforcements, and slab openings are positioned with pinpoint accuracy lengthy earlier than the gear arrives on site.
Coordination extends past the in simple terms structural. The electrical and environmental infrastructure, which serves as the existence guide machine for the computerized equipment, should be meticulously deliberate and pre-installed. This consists of presenting ample electricity furnish capability with clean, secure voltage to motor drives and manipulate systems; imposing strong grounding and lightning protection; and designing logical cable routing pathways that are each on hand for renovation and included from damage. Furthermore, environmental concerns are integral. Proper drainage have to be in region to stop water accumulation in pits or on the running plane, and air flow structures have to be designed to control warmness dissipation from tools and hold air first-class in enclosed parking areas.
When this coordination is performed effectively, it creates a seamless handover from the civil contractor to the gear installer. It eliminates the want for costly and time-consuming rework, such as chipping concrete to relocate anchors or making use of self-leveling compounds over giant flooring areas. This, in turn, helps a extra efficient, predictable, and higher-quality mechanical and electrical set up phase, as technicians can work from a flawlessly organized canvas.
For developers, generic contractors, and subsequently the task owners, investing sources in fostering this early-stage alignment is a established approach for hazard mitigation and cost creation. It immediately improves common task effectivity with the aid of stopping agenda slippage, enhances ultimate great manipulate by using making sure the gadget operates as designed, and protects the long-term performance and return on funding of the pallet-type planar parking projects. This collaborative strategy transforms the venture from a collection of sequential duties into a without a doubt built-in device delivery.
Technical Specifications
|
Product Types |
Pallet Horizontal Parking System |
|
|
Car Size |
Max Length (mm) |
5300 |
|
Max Width (mm) |
2050 |
|
|
Height (mm) |
1550 |
|
|
Max Weight (kg) |
2350 |
|
|
Lifting Motor Power |
15-22Kw |
|
|
Shifting Motor Power |
2*2.2Kw (Two Motors) |
|
|
Power of Vehicle Storage Mechanism |
2*1.1Kw (Two Motors) |
|
|
Lifting Speed |
0-60m/min |
|
|
Speed of Vehicle Storage Mechanism |
0-30m/min |
|
|
Drive Method |
Motor-driven, Chain or Wire Rope Lifting |
|
|
Control Method |
Button/IC Card |
|
|
Power Supply |
Three-phase 380V 50Hz |
|
Product Illustration
|
Front View |
Left Side View |
Top View |
|
|
|
|
Product Display
About Us

Hot Tags: coordination between civil works and pallet parking equipment, China coordination between civil works and pallet parking equipment manufacturers, suppliers, factory, Comb Horizontal Shuttle Parking, Pallet Horizontal Parking System, horizontal circulation parking system, Clamp Horizontal Shuttle Parking