The set up timeline for mechanical parking structures relies upon chiefly on project‑specific conditions, consisting of website accessibility, structural readiness, machine complexity, and coordination with different development activities. For a usual Two-Tier Systems, set up typically levels from three to eight weeks from web page handover to commissioning-assuming popular foundations, an unobstructed working area, and no enormous delays due to weather, permitting, or integration issues.
Key elements influencing period include:

  • Site practise – present slab condition, anchoring requirements, and utility rerouting
  • System scale – wide variety of parking levels, modules, and car capacity
  • Access and logistics – crane availability, fabric staging space, and working hour restrictions
  • Integration desires – electrical supply, manage machine interfaces, and protection validations

Modular Two-Tier Systems are designed to streamline installation: prefabricated aspects decrease onsite fabrication, and sequential meeting lets in a couple of work fronts to development simultaneously. For retrofits or occupied buildings, phased set up can similarly optimize timing to limit operational disruption.
While every challenge is unique, Comant skilled installers work inside clear milestones-foundation readiness, structural assembly, mechanical‑electrical integration, and closing testing-to supply predictable scheduling and dependable gadget overall performance from day one.

 

Technical Specifications

 

Product Types

 Puzzle Parking System

Car Size

Max Length (mm)

5300

Max Width (mm)

2050

Height (mm)

1550/2050

Weight (kg)

≤2350

Vehicle Capacity

(2n-1) units

Where n is column quantity

Lifting Motor

2.2kw

Shifting Motor

0.2kw

Lifting Speed

4.5m/min

Shifting Speed

8.0m/min

Drive Method

Motor-driven, Chain or Wire Rope Lifting

Control Method

Button/IC Card

Power Supply

Three-phase 380V 50Hz

 

Orthographic Projections

1
Front View
2
Left Side View
3
Top View

Product Display

 

 

About Us

product-1172-429

Hot Tags: how long does installation usually take?, China how long does installation usually take? manufacturers, suppliers, factory, Two Level Lift and Slide Parking System, Comb tooth Vertical Lift Parking System, Tunnel Aisle Stacking Automated Car Parking, Flat Moving 3D Parking Solution, Clamping Flat Moving Multi Level Parking Garage, Puzzle Parking Solution

Send Inquiry

whatsapp

Phone

E-mail

Inquiry